9:00 A.M. – 5:00 P.M.
Pre-Conference Workshop - Real Availability
The design, construction, operation, and maintenance of mission-critical facilities is a demanding art. 7x24 Exchange members know from first-hand experience that end-to-end reliability requires attention to all the details while never losing sight of the big picture. Most of the specialized knowledge and training is learned on the job - until now.
Steve Fairfax and MIT Professor Mike Golay have distilled decades of applied reliability theory and practice into a one-day seminar - Real Availability. Developed especially for 7x24 Exchange International, Real Availability will both challenge and change the way you think about reliability and availability.
Topics include
Evaluating the reliability of data center power systems
Why you can't contract for availability
Understanding and reducing human error in data center operations
Determining optimal test and maintenance strategies
Real-world examples and case studies
The course has proven extremely popular in past years. 96% of 7x24 Exchange members who evaluated the 2004 and 2005 Real Availability seminars said they would use Real Availability concepts on the job. 100% said that they would recommend the course to others.
Includes course materials, continental breakfast and lunch. All participants are eligible for CEU credits.
*There is an additional fee for this full-day, pre-conference workshop.
Steve A. Fairfax, President, MTechnology, Inc.
Michael Golay, Ph.D., Professor, MIT Nuclear Engineering Department
|
|
|
|
|
|
12:30 P.M. – 2:30 P.M.
Tutorial Session A: Commissioning - The Owner's Investment in Reliability
In Mission Critical Facility construction, every entity on the Design and Construction Team has a Quality Assurance Program - the architect, the engineer, the contractors, and the equipment manufacturers. The owner's QA program, though sometimes not advertised as such, is the building commissioning process. This presentation explores the electrical and mechanical commissioning processes and standards, and discusses how the owner can help to ensure their building systems will satisfy their expectations and needs. Discussion will include procurement of commissioning services, the commissioning process, expected fee ranges, expected processes and results. A few examples of system problems and their resolutions will be presented.
Daniel Parker, P.E., President, Hood-Patterson & Dewar, Inc.
Ken Meline, Principal, Command Commissioning
|
|
|
|
|
|
3:00 P.M. – 5:00 P.M.
Tutorial Session B: Fluid Mechanics 101: Fundamentals of Cooling Airflow in a Data Center
This tutorial session will introduce basic concepts of air velocity, airflow rate, pressure, and temperature distribution as applied to raised-floor data centers. You will be shown why the flow distribution through the perforated tiles is usually not uniform. It is governed by the air velocity and pressure variation under the raised floor. By calculating this variation, you can predict the airflow coming out of each perforated tile. Such a calculation allows you to study the effect of variables such as: layout of the CRAC units and the perforated tiles, the height of the raised floor, and the presence of obstructions under the raised floor. Once the flow rates through the perf tiles are determined, the next step is to calculate, in the above-floor space, the air velocity and temperature as the air moves through the server racks and back to the CRAC units. Many examples will be presented to develop an understanding of the physical processes and to draw practical conclusions. The tutorial will show how to create a computational model of a data center layout and calculate the corresponding airflow and temperature distribution.
Suhas V. Patankar, Ph.D., Professor of Mechanical Engineering, University of Minnesota and President, Innovative Research, Inc.
|
|
|
|
|
|
3:00 P.M. – 5:00 P.M.
Tutorial Session C: A Comprehensive Look at Fire Protection Technologies and Codes
This presentation will educate owners and consultants about the detection, control and extinguishing technologies specific to the mission-critical facility. Included are requirements of the new edition of the National Fire Alarm Code and the American National standards for IT and Telecommunications facilities.
Brian K. Fabel, P.E., Director, National Accounts, Orr Protection Systems, Inc.
|
|
|
|
|
|
8:30 A.M.
Conference Keynote: Failure is Not an Option
As the leader of the "Tiger Team" of flight directors who brought the Apollo 13 spacecraft safely back to Earth on April 17, 1970, Gene Kranz demonstrated extraordinary courage and heroism. An extraordinarily gifted leader and motivator, Kranz inspired his Tiger Team to hold fast to the highest standards possible. Together, they struggled to devise the plan that would safely bring the ship and its crew of three astronauts home after its oxygen system failed.
"Failure is not an option," the motto that carried him through the Apollo 13 crisis, is a major theme of his motivational speeches today. Kranz speaks with passion and pride about the NASA employees who formed his mission teams-teams that worked hard and made history in the 1960s and '70s. He explains that his flight directors were young engineers and scientists, most of them in their twenties, having come to NASA fresh out of school with little work experience, but with abundant energy, and the will to succeed at one of humankind's most challenging endeavors: space exploration.
The Apollo 13 crisis pushed Kranz and his team to the brink of fear and doubt, but they refused to give in to these emotions or to succumb to panic. Instead, under his leadership, they worked together to save the imperiled spacecraft, and brought the ship and crew safely home. Kranz speaks with a raw brilliance about the challenges and problems that they successfully faced and overcame, giving his audiences the inspiration that they need to face down challenges and adversity in their own lives and careers.
Gene Kranz, Former Director of Mission Operations, NASA
|
|
|
|
|
|
10:00 A.M.
Active Power - Peeling the (Green) Onion: What Does Green Really Mean for Data Center Power?
A famous frog once sang, "It's not easy being green." Most of us would agree that green facilities, while ideal in theory, prove challenging in fact to understand, design and implement. What is required? What is recommended? What does it really mean to be a "green" data center? With momentum building for tougher environmental legislation, we no longer have the luxury of maintaining the status quo. In this session, Perkins will dissect (sorry, Kermit) various elements of "green-ness," including power and space requirements, pending legislation, program certifications, Green Grid efforts and more. Perkins will also suggest practical methods to minimize overhead power consumption by improving energy efficiency and exploring viable, reliable quality power alternatives at the facility level.
David Perkins, Chief Technical Officer, Active Power
|
|
|
|
|
|
11:00 A.M.
Innovation: A Case Study in Facility Risk Assessment
Many data center outages can be prevented if the underlying risks are identified and appropriate action taken proactively. Data supports this. Like most other big banks, Wells Fargo had, over the years, engaged just about all the major engineering consultancies to perform risk assessments of their various core data center sites. Concerned by the inconsistencies and gaps between the reports, the Bank asked DataSpace to review the process and make adjustments, in advance of another round of these assessments to be performed at four core data centers in the Bank's portfolio. Working together, Wells Fargo and DataSpace built a comprehensive risk assessment document tool kit and process methodology that eliminated the gaps and provided needed consistency in these assessments, site to site and year on year. The program continues to utilize engineering specialists from various firms, while providing a consistent look and scope. Learn about the positive feedback and acceptance from regulators and governance officers at the bank. Through a continual process of refinement, DataSpace has made this approach available to other enterprises, with the same excellent results. Come hear how your institution can standardize this process and create these results.
Fred Dickerman, Principal, DataSpace Advisors, Inc.
Catherine Gedney, Regional Facilities Manager, Wells Fargo Bank
|
|
|
|
|
|
1:15 P.M.
Cisco - Data Center Transformation
Today's data centers are transforming dramatically to meet IT demands for greater efficiency. Changing limitations -- from power and cooling to asset utilization to provisioning, further pinched by evolving business requirements of Web 2.0 such as greater collaboration, faster response time, compliance -- mean the Data Center can no longer be viewed through the same lenses. In his presentation, Douglas Gourlay, senior director of Cisco Data Center Solutions Group, will focus on how current technologies can transform business operations and efficiency.
Doug Gourlay, Senior Director, Data Center Solutions Group, Cisco
|
|
|
|
|
|
2:45 P.M.
The Critical Role of ITIL Methodology in the 7x24 Environment
Management of a 7x24 Environment presents not only technical challenges, but business operations challenges as well. Use of the ITIL methodology helps to organize and standardize everyday practices, both technical and procedural. Introducing this methodology, however, will require a cultural shift in how you look at, and manage, your environment - forcing you and your staff out of your comfort zone, and posing potential weakness in your operation. Are you ready to face your deficiencies head on or is it worth the risk?
Donna Manley, IT Senior Director, University of Pennsylvania
|
|
|
|
|
|
3:45 P.M.
Virtual Tour - 365 Main Data Center - Chandler, AZ
This 45 minute video tour takes an extensive look at 365 Main's modern 315,000 square foot data center based in Chandler, Arizona. The video details how 365 Main increased the power density in data center to 150 Watts per square foot, more than twice the original design. You'll also learn about the history of the building, challenges faced during build out, and how the data center operates. Topics include: comprehensive overview of electrical and mechanical systems; contingency plans and emergency procedures; quality controls including auditing and monitoring of security, cooling and power systems; and energy efficient best practices.
Jean Paul Balajadia, Senior Vice President & Founding Partner, 365 Main
|
|
|
|
|
|
9:00 A.M.
Keynote: HP - Increased Efficiency Through Improved Datacenter Automation
This presentation will address the relative merits to increase data center efficiency through supplemental cooling (cooling redistribution), automated cooling management to drive energy conservation and efficiency, and traditional data center designs. The presentation will address why traditional designs are not the correct approach, and why driving increased automation is the real future of datacenter energy management and cooling efficiency.
Ken Baker, Datacenter Infrastructure Technologist, HP Dynamic Smart Cooling
|
|
|
|
|
|
10:30 A.M.
Building the Absolutely, Positively Fault Defiant Data Center
Not all data centers are created equal: some are responsible for protecting millions of lives or millions of dollars every second. When these facilities fail, people die… or, careers do. It's as simple as that. For these types of facilities, "fault tolerance" isn't enough… they need to be "fault-defiant" from the electrical power infrastructure on up. Especially during blizzards, earthquakes, and Category 5 hurricanes. Because 40% of business downtime is caused by electrical power problems - and 80% of those problems are rooted in internal power infrastructure problems - this panel of experts will explore the newest trends in power system design, diagnostics, and deployment… and the results of their use of advanced technologies to maintain power systems resilience.
Moderator:
Mark A. Ascolese, Co-Founders, Critical Power Coalition
Panelists:
Ken Baker, Datacenter Infrastructure Technologist, HP Dynamic Smart Cooling
Dave McMullen, Director - Information Technology Operations, Blue Cross-Blue Shield of Florida
Peter Gross, CEO-CTO, EYP Mission Critical Facilities
Adib Nasle, President, EDSA Micro Corporation
|
|
|
|
|
|
1:45 P.M.
Emerson/Liebert's Tale of Two Data Centers: Creating High Density Computing Environments in Two Space-Limited High Availability New York City Organizations
At Rockefeller University in New York City, data center space is scarce. So when their current data center needed to move into a new space - totaling 1,000 sq. ft. - project managers were forced to think outside the box to strategically maximize the area. The result is a high-density facility enabled by supplemental cooling that helps maintain 24 x 7 availability of academic, administrative and research computing equipment. Across town, operations never cease for a global financial services giant. When blade servers were deployed at this bank's Manhattan facility, not only did computing capacity and speed rise, so did blade-related heat issues and the risk of downtime. This case study presentation will focus on how innovative supplemental cooling strategies are enabling success for both organizations. Presenters will also touch on supporting power and monitoring solutions that have made these high density - and high availability - computing environments possible.
Lennart Stahl, Senior Product Manager, Liebert Solutions, Emerson Network Power
Stuart Cohnen, Data Center Manager, Rockefeller University
Mark Gerard, President, DP Facilities
|
|
|
|
|
|
2:45 P.M.
Current Trends in Data Center Design and Construction
Holder Construction has completed the construction of over 80 major Data Center Projects in the last 10 years and has maintained a database of all the Design and Construction issues associated with each of these projects. In this session we will share information from this database regarding what decisions Owners have made regarding critical Design and Construction issues associated with their Data Centers. This session will review the statistics regarding the different decisions made by Owners regarding structural, architectural, mechanical, fire protection, electrical, controls and security systems on their projects. This session will also provide some insight regarding why the decisions were made for the various data center facilities. The projects in this database were for Owners from numerous fields including financial institutions, insurance companies, internet providers, communications companies, and other corporate users.
Rick Morgan, Senior Vice President, Holder Construction
Tony TeVault, Vice President, MEP Services, Holder Construction
BJ Butler, VP, Senior Asset Manager, Citigroup
|
|
|
|
|
|
4:15 P.M.
Breakout A: Continuous Cooling - The Realities Behind the Concept
As the average power density in data centers continues to rise over
time; maintaining control of the computer equipment cooling
environment in the event of a facility power outage has become more
challenging. Continuous cooling is not often set as a design
requirement and presents a cost burden for many high density data
centers without an industry accepted and documented design rational
for its use. The purpose of this presentation is to: identify at what
load densities facilities cross over and require continuous cooling;
look at the realities of how fast cooling systems can be restarted on
stand-by power; based on the above, provide a design basis for sizing
of continuous cooling systems; present practical design solutions of
continuous cooling systems to minimize cost and maintain reliability;
identify the cost metrics of thermal storage and serving mechanical
systems from UPS power. The investigation into the need for
continuous cooling will be supported by a truly transient
Computational Fluid Dynamic (CFD) model. This perspective will
be a unique view into the transient data center environment not
commonly seen in the industry. The results of this transient model
will be presented at various load densities to give the audience a
sense of scale of the issue and potential problem. The model will
document temperature build-up in the data center while IT
equipment is operating on UPS power and before the cooling
systems are restarted which will lead into when and where
continuous cooling is really needed. The remainder of the
presentation will document cost effective solutions based on real
time experiences.
Paul Leonard, Engineering Design Principal, KlingStubbins
Gerard Murray, Engineering Design Principal, KlingStubbins
|
|
|
|
|
|
4:15 P.M.
Breakout B: Practical Methods of Managing Data Center Cooling
The presenter will cover best practices of managing data center
cooling and provide practical methods of proactively managing
cooling load growth. Topics covered include how to: size data center
cooling and distribution; create flexibility; manage growth from 10 to
100% load; measure air flow and detect air flow shortages. This
presentation will explore the value and approach to integrated system
testing (IST) methodologies as well as key areas for minimizing
energy expenses including the importance of humidity control and
temperature control (cooling towers, chillers, Chilled Water, return
air). Existing data centers will be explored from the standpoint of
applying lessons learned. The future will be touched on anticipating
how to respond to VM Ware – variable flow proposition. This
presentation will be interactive allowing participants to discuss their
own specific issues and receive possible solutions.
Dennis Kniery, Vice President, Corporate Facility Operations - HVAC, Countrywide
|
|
|
|
|
|
4:15 P.M.
Breakout C: Integrating Clinical Systems Informatics to Improve Patient Care
Hospital administrations today are incorporating the latest technology from building systems monitoring to electronic billing to Clinical Systems Informatics Integration (CSII). Advanced technology means getting all of a hospital's clinical and diagnostic equipment to communicate, ultimately driving hospitals to build sophisticated mission critical data centers. Using one of Gilbane Building Company's recently completed projects at Civista Medical Center in La Plata, Maryland, as a case study, this presentation examines the impact that these advanced systems have on buildings and how healthcare clients can prepare to budget and integrate these innovative technologies.
Melanie Townshend, LEED, Project Executive, Gilbane Building Company
Linda Minghella, Director of Information Technology, Civista Medical Center
Dennis Cronin, Principal, Mission Critical, Center of Excellence, Gilbane Building Company
|
|
|
|
|
|
8:45 A.M.
Keynote:
IBM - Can Mission Critical Servers and Storage be Green?
What makes IT equipment green? All equipment uses energy and must be cooled. There are shades of greenness when it comes to environmentally "friendly" equipment. Some practices are NOT green and need to be avoided if energy or environmental responsibility matters. Being green just does not happen. Green can be designed and planned into mission critical solutions. Green first needs to be designed into components and their packaging, subsystems (processor, memory and I/O) and at the systems level. Next solutions and technology should be used enhance green servers and storage from reliability and energy efficiency perspectives. There are green mission critical Systems that can serve as examples for organizations to follow. With green initiatives many examples can be starting points for future energy savings with reliability. Beginning with the end in mind it is possible to have green Mission Critical Servers and Storage.
David F. Anderson, PE, PMP, Systems Team Leader, IBM Poughkeepsie Briefing Center
|
|
|
|
|
|
10:15 A.M.
US Government Programs to Advance Data Center Energy Efficiency
The U.S. DOE and EPA are coordinating on complimentary programs focused on data centers and the IT equipment they support. This presentation will describe the goals and objectives of the programs along with on-going and near term activities. The DOE Save Energy Now program is incorporating data center systems into the very successful program that is identifying large energy saving potential in US industrial plant systems. This program includes data center assessments involving assessment tools, best practices identification, demonstrations of new technology and more. EPA is coordinating with DOE and the EPA program will utilize assessment data obtained through the DOE Save Energy Now program in the Energy Star Buildings program. EPA is also proceeding on a two phased investigation to develop Energy Star requirements for servers.
William Tschudi, , Lawrence Berkeley National Laboratory
|
|
|
|
|
|
11:15 A.M.
Business Continuity Improvements Through Real-Time and Very Early Warning Environmental Systems
This session describes the mounting environmental risks facing the data center and new methods and technologies available to mitigate and manage them. Traditional building-based fire detection, control, evacuation and suppression solutions, and new asset- and process-specific methods are described and compared. The session illustrates the advantages of the new methods in providing business continuity with a focus on very early warning smoke detection and sophisticated remote monitoring of the environment. The Air-sampling Smoke Detection systems used to protect the Gaylord Texan are used as a case study for the flexibility and performance of modern approaches to business continuity.
Scott Wilson, Segment Marketing Director, Xtralis
|
|
|
|
|
|
|